The McPlumbing Continuum, the ideal vs reality. We have been in this orbit before… a McPlan to deviate from. It rarely goes the way I expect it should. Now I’m trying to creatively get the right results with the parts that are available. Pray for wisdom, patience and parts.
The before thought…What to do? What to do?
Jump in and dig… The idea is to install five new pipes in this new 100-meter ditch, one main water line, one filtered drinking water line, one for fiber optics, one main power and one for telephone.
Now, how does that go? The arm tube is connected to the elbow tube, the elbow tube is connected to the long tube, the long tube is connected to the tee tube, etc…
What do you mean, what am I doing at 5 pm Friday night? I’m fixing. It’s what a Jim McFixer does. Actually, the blue t-shirt guy is Stan, “my right hand man”, Swank. The guy on the bridge is Paul, “can do it all”, Beadle. Both of these men are invaluable resources of knowledge and labor. God was good to give them to me for a season. Well actually, I think Paul will be here forever.
Hey, get away from that water valve… I don’t want a bath right now…
The after thought…we should have hired it out…Keep praying…its not done yet.
Jim & Judy McFixers